The plot is based on events that took place during the severe drought of the early 1970s at the construction of the Toktogul Hydroelectric Power Station. The commissioning of the station's first phase was complicated by the fact that the water needed to start it was also desperately needed by the parched fields. There were many debates (with both personal and professional ambitions involved), and in the end, the problem was solved purely mathematically—rather than by agricultural engineering: salty water from the Kyrgyz Sea was diverted to the fields, while clean mountain river water was directed to the first turbines.
Where to watch US
Not streaming in US right now.
On location
No pins on the map for this one yet. Check IMDB filming locations ↗
The cast
